Industry news|2022-02-28| admin
The main components of the plum blossom elastic coupling are the shaft sleeves at both ends and the elastic body in the middle. The elastic coupling can transmit torque with zero backlash and no vibration. Backlash can be eliminated with elastomers. Some problems will also be encountered in the application of elastic couplings. Today, I will introduce to you how to install elastic couplings during use and what to pay attention to.
1. Before installation, first check whether the two shafts of the prime mover and the working machine are concentric, whether there is wrapping paper and collision on the surfaces of the two shafts, whether there are debris in the inner holes of the two half couplings of the plum coupling, and whether there is collision at the edge of the inner hole . If so, clean the shaft and coupling halves and use a fine file to handle the bumps. Then check whether the diameter and length of the inner hole of the two half couplings are consistent with the diameter and length of the shaft extension of the prime mover and the working machine. In general selection, it is better to let the length of the half coupling at the end of the prime mover and the working machine be less than the length of its shaft extension by 10-30mm.
2. In order to facilitate installation, it is best to put the two half couplings into a 120-150 incubator or oil tank for preheating, so that the size of the inner hole is increased and it is easy to install. After installation, make sure that the shaft head cannot protrude from the end face of the half coupling, preferably flush. Detect the distance between the two half couplings: measure the readings of 3-4 points along both sides of the half coupling flange, as well as the sum of the measured dimensions of the extension section and the two membrane groups, and the error is controlled in the range of 0-0.4mm Inside.
3. Correction: use a dial indicator to detect the runout of the flange end face and outer circle of the two halves of the coupling. When the outer circle of the flange is less than 250mm, the runout value shall not be greater than 0.05mm; when the outer circle of the flange is greater than 250mm, the runout value shall not be greater than 0.08.
4. Install bolts: Insert the bolts from the outside of the small hole of the flange, and pass through the outside of the large hole of the other flange. Put on the buffer sleeve, elastic washer, twist the nut, and tighten the nut with a wrench. If the installation is uncomfortable or disassembled for replacement, the shaft and half-coupling will not be damaged, and it is best to rotate freely after installation.
5. Operation instructions: Before starting the equipment, check whether the nut of the plum coupling is loose or falls off. If so, tighten the nut with a wrench in time.
The installation process of the plum blossom coupling does not require too many preparations. The main thing is to do the preparatory work before installation, grasp the details of the installation well, and do the debugging work well. More is still a matter of details, so try not to install it before the preparations are done. For more questions, you can consult Shenzhen Weidong.
| 亚洲国模无码一区二区 | 线路一线在线观看欧美国产精品路二 | 91精品久久久无码人妻 | 香港三日本三级少妇99 | 91精彩刺激对白露脸偷拍 | 亚洲无码强奸乱伦一区蜜桃av | 看黄色片一级的中国的 | 特级做a爰片毛片免费看观看 | 甘肃WBBBB搡wBBBB| 国产无码在线观看免费 | 女仆穿白丝裸体吃奶玩乳网站 | 久久久婷婷综合国自产拍揄泬 | 久久久精品国产sm最大网站竹菊 | 男女午视频免费观看 | 国庆精品久久久久99变态蜜臀 | EEUSS鲁片一区二区三区 | 日韩欧美猛交XXXXX无码 | 91无码人妻精品国产色情竹菊影视 | 欧一美一乱一婬一视一频 | 日本真人做受120秒试看 | 一级高清无码视频 | 近親相姦五十路の在线 | 亚洲乱码国产乱码精品精大量 | 黄色网址成人在线观看 | 精品人妻无码一区二区三区四区无码 | 亚洲精品久久国产片400部色戒 | 国产精品一级毛片无码小说 | ..真实国产乱子伦对白在线_欧 | 91一区二区中文字幕人妻 | 亚洲精品国产手机 | 性爱一级片免费观看 | 一起草 久久蜜桃乌龙麻豆91 | 五十路老熟妇一区二区三区 | 国产一级做a爱免费高潮小说 | 精品国产乱码久久久久久虫虫漫画 | eeuss一区二区三区乱码 | 又粗又大又黄A片免费看久久久 | 免费观看丰满少妇做爰视频 | 老司机午夜福利私人定制 | 91三产区少妇在线观看 |